Budget Rollover Calculation
You can now include budget data from subelements in the budget rollover calculation. Previously, the rollover function only considered element-level budget data.

When calculating budget rollovers, you can choose between two calculation methods:
-
Element Budget: Uses only the direct budget data from the element
-
Include Budget of Subelements: Includes budget data from all subelements in the calculation (default setting)

-
Navigate to Planner > Settings > Budget.
-
In the Rollover Budget section, select your preferred calculation method:
-
Select Element Budget to use only direct element budget data
-
Select Include Budget of Subelements to include subelement budgets in calculations
-
Note
All elements must be based on the same currency. Any elements with a different currency to that of the parent element will not be included in the calculation.
Example
Consider a marketing activity with the following structure:
-
Trade Show (Parent Element)
-
Booth Design (Subelement)
-
Staff Travel (Subelement)
-
Marketing Materials (Subelement)
When you select the rollover budget radio button:
-
Element Budget, only the budget directly assigned to "Trade Show" rolls over
-
Include Budget of Subelements, all combined budgets of Trade Show, Booth Design, Staff Travel, and Marketing Materials roll over

-
Existing rollover calculations remain unchanged until you modify this setting
-
The calculation method applies to all future budget rollovers once set